May 2021

On the south bank, the first construction phase has already been sealed and the dewatering system has been installed. Due to the high volume of water in the excavation pit, the south bank must be divided into a total of 3 construction sections. As soon as...

The helicopter storage hall on the army airfield in Niederstetten (object planning: Ecker Architekten, structural design: Engelsmann Peters) is awarded the Small Hugo of the Association of German Architects (BDA). The hall structure in lightweight steel construction with a striking...