Cycle path bridge Gratwein - construction progress 3

Cycle path bridge Gratwein - construction progress 3

The paving slab has already been concreted. Now the formwork for the edge beams is being built. The prefabricated, sloping formwork elements already make the elegantly curved silhouette of the bridge visible.

Construction progress on the Gratweiner side
Concreted paving slab and parts of the edge beam reinforcement
Shuttering of the window cutouts above the pier