On the south shore, the seaward bank walls of the 1st construction phase are being concreted and the 2nd construction phase is being prepared for sheet piling. This means that a large part of the load-bearing substructure of the 1st construction phase has already been completed. A stepped slab will be concreted onto the walls, which will be covered with granite block steps. The southern bank area is to be completed in autumn.